Christ’s Hospital School Theatre

Project Details

christhospital

Total Project Value
£ unknown

Specialist Works Value
£249,000

Design Start Date
February 2019

Project Start Date (SW)
November 2019

Project Completion Date
December 2020

Theatre Consultants
Theatretech

Main Contractor
VG Builders

Henley Theatre Services supplied and installed the production lighting, stage engineering, back stage blues, house lights, drapery & tracks as part of the refurbishment and betterment of this 1975 theatre designed by renowned architect Bill Howell, who was also the architect for the Young Vic. (500 seats)

The Production lighting.
72 ways of Zero 88 Bypass dimmers
Stage engineering 5 x new 500kg pile wind winches with configured limits
50 x ETC ColorSource fixtures,
DMX network
Multiple lighting bars.
Complete Arc House system.
Back stage blues
Stage drapery